Skip to main content
UAE-based HORECA supplier · Sharjah warehouse UAE-wide delivery Dubai · Sharjah · Abu Dhabi Send an enquiry
Complete café setup · UAE

Complete Café Setup
in Dubai, Sharjah,
Abu Dhabi & the UAE

We handle the whole café, from concept to opening day: interior design, fit-out, furniture, coffee and kitchen equipment, POS and cash register, CCTV, tableware, packaging and cleaning supplies.

One team, one requirement list and one point of contact. After you open, we keep you supplied every week.

Start on WhatsApp Call +97165266504

Dubai• Sharjah• Abu Dhabi• UAE-wide supply• Plans tailored to your venue• Restocking after opening

The scope

What a complete café setup covers

Take all of it, or only the parts you need. Most customers start with equipment and supplies, then keep us for consumables.

Design

Interior design and layout

We plan the look and the layout together: where the counter goes, how customers move from the door to the till to pick-up, the seating, the lighting and the back-of-house, so the room works on a busy morning.

Fit-out

Counters, joinery and finishes

We handle the fit-out: counters, back-bar, shelving, joinery and finishes, built around the machines you are buying, with power, water and drainage points planned for each one.

Equip

Coffee, kitchen, refrigeration

Espresso machines, grinders, brewers, water filtration, blenders, ice machines, ovens, under-counter fridges and display chillers, sized to your menu and expected customers.

Furnish

Furniture, lighting and signage

Tables, chairs, bar stools, outdoor seating, lighting and the sign above the door, chosen to match the interior and built for daily commercial use.

Systems

POS, cash register and CCTV

A POS system with cash register and receipt printer, set up with your menu, and CCTV covering the counter, the till and the entrance.

Supply

Tableware, packaging, restocking

Cups, crockery, glassware, smallwares, takeaway packaging with your logo and cleaning supplies, then the consumables on a regular delivery once you open.

Checklist

Café setup checklist: what a new café needs

The equipment and supplies most cafés need on opening day, station by station. It is drawn from the cafés we have set up; your menu decides the final list, and we build it with you. For more detail, see the full café equipment list.

Espresso and coffee bar

  • Espresso machine and grinders
  • Water filtration
  • Milk jugs, tampers and knock box
  • Coffee scales and thermometers
  • Syrup pumps and sauce bottles
  • Machine cleaning brushes and detergent
Browse espresso and coffee bar →

Cold drinks and display

  • Under-counter fridges
  • Display chiller for cakes and drinks
  • Ice machine and ice scoops
  • Blenders and juicers
  • Drink dispensers
Browse cold drinks and display →

Kitchen and prep

  • Oven and panini grill
  • Prep fridge and work tables
  • Sinks and dishwasher
  • GN containers and food storage
  • Knives, boards and utensils
  • Food labels, timers and scales
Browse kitchen and prep →

Front of house

  • Cups, mugs and saucers
  • Glassware and plates
  • Cutlery and service trays
  • Napkin, menu and sugar holders
  • Tables, chairs and stools
Browse front of house →

Takeaway

  • Cups, lids and sleeves
  • Cup carriers and bags
  • Takeaway boxes
  • Straws, stirrers and napkins
  • Printing with your logo
Browse takeaway →

Cleaning and hygiene

  • Mops, buckets and floor wipers
  • Microfiber cloths and sponges
  • Cleaning chemicals and spray bottles
  • Gloves, hairnets and aprons
  • Hand soap dispensers and bins
  • Floor mats and first aid kit
Browse cleaning and hygiene →

Systems and security

  • POS system set up with your menu
  • Cash register and receipt printer
  • CCTV for the counter, till and entrance

How it works

From first message to opening day

You don't need a finished equipment list. Send a menu, a floor plan, an old list, or just the concept — we build the requirement around what you're actually opening.

Tell us the concept

A menu, a floor plan, an old equipment list — or just the idea and the location.

We build the list

We turn it into a requirement list scaled to your covers and your menu.

Review and confirm

We review suitable options with you and confirm the equipment list against your menu, expected covers and space.

Supply

Stocked items ship quickly; specified equipment we flag early for lead time.

Coordinate setup

Fit-out and deliveries sequenced so the room is ready when the equipment lands.

Restock after you open

Disposables, cleaning supplies and replacements on a regular delivery.

Timeline

How long a café setup takes

A small café typically takes about two to four months from concept to opening. These are typical durations, not promises: the unit, approvals and equipment lead times decide yours. Step by step: how to open a café in Dubai.

  1. Concept, menu and layout

    About 1 to 2 weeks

    We agree the concept, the menu and the layout, and build the first requirement list.

  2. Interior design

    About 2 to 4 weeks

    Design, finishes and furniture are signed off, along with any landlord approvals your unit needs.

  3. Fit-out

    About 4 to 8 weeks

    Counters, joinery, lighting and signage are built. Long-lead equipment is ordered at the start so it is not what delays you.

  4. Equipment and supplies

    Final 1 to 2 weeks

    Equipment is delivered and installed, the POS and CCTV are set up, and the opening stock arrives.

  5. Trial run and opening

    About 1 week

    Staff practise on the real equipment, then you open. We restock you from the first week.

Why it helps

Why café owners run it through one team

One coordinated requirement list

Splitting a setup across an equipment dealer, a packaging supplier, a cleaning company and a branding agency means four lead times and four people to chase when something slips.

Fewer compatibility mistakes

The gastronorm pans match the refrigeration. The cups match the lids. The counter is built for the machine you are buying.

Equipment and consumables together

We specify equipment we will still be serving you consumables for in two years, so it is not in our interest to sell you the wrong thing.

Supply continues after opening

The same account and the same delivery keeps you stocked once you are trading — not a handover and goodbye.

Not sure yet?

You don't need the equipment list to start

Most people who message us have a concept and a location, not a specification. That's enough. Send us any of these and we'll build the requirement around it:

  • Your menu, even a draft
  • A floor plan or the unit size
  • An equipment list from a designer or consultant
  • Photos of an existing venue you are upgrading
  • Just the concept and the emirate

Concepts

Cafés we set up

Any size, from a single-counter coffee bar to a multi-branch rollout.

Speciality coffee shops
Café-restaurants
Brunch concepts
Bakery cafés
Juice & smoothie bars
Dessert cafés
Drive-through coffee kiosks
Hotel coffee corners
Office & retail concessions

Questions

Frequently asked questions

Do you handle a complete café setup, including interior design and fit-out?

Yes. We handle the whole café from concept to opening day: interior design, fit-out, furniture and signage, coffee and kitchen equipment, POS and cash register, CCTV, tableware, packaging and cleaning supplies. You can also use us for one part: plenty of customers already have a designer and come to us for equipment and supplies.

Can you set up the POS system, cash register and CCTV?

Yes, they are part of a complete setup. We set up the POS with your menu, with a cash register and receipt printer, and install CCTV covering the counter, the till and the entrance.

How long does it take to set up a café in Dubai?

A small café typically takes about two to four months from concept to opening: a few weeks for concept and design, four to eight weeks of fit-out, then equipment, systems and a trial week. The unit, approvals and equipment lead times decide your exact timeline, so we order long-lead items first.

What equipment does a new café need?

Most cafés need an espresso machine and grinders, water filtration, under-counter fridges, a display chiller, an ice machine, a blender, an oven or panini grill, a sink and dishwasher, plus barista tools, tableware, takeaway packaging and cleaning supplies. The checklist on this page lists it station by station; your menu decides the exact list.

What do you need from me to start?

Whatever you have: the concept, the location or unit size, a draft menu and your target opening date. A floor plan or an existing equipment list helps, but it is not required.

What size of café do you work with?

Any size, from a single-counter coffee bar or kiosk to a café-restaurant or a multi-branch rollout. The process is the same; the list is not.

Can I send you my menu?

Yes, and it is the most useful thing you can send. The menu decides the cooking line, the refrigeration and most of the smallwares.

Can I send a floor plan?

Yes. A plan or even the unit size lets us size the counter, the back-of-house and the refrigeration properly.

Can I send an existing equipment list?

Yes. If a designer or consultant has given you a list, we can review it and flag items that appear over- or under-specified for your menu and venue.

Which emirates do you cover?

Dubai, Sharjah, Abu Dhabi and across the wider UAE.

Can you supply branded packaging with our logo?

Yes — custom-printed cups, food boxes, napkins and carrier bags. If you do not have a logo yet, we can create one.

Do you restock after opening?

Yes, and most customers do: disposables, cleaning supplies, charcoal and replacement smallwares on a regular delivery.

Opening a café? Send us what you have.

Menu, floor plan, equipment list, or just the concept — we can start from there.

Start on WhatsApp Call +97165266504
Chat on WhatsApp
Plan my café WhatsApp us